Home » Conducting engineering and geological surveys

Conducting engineering and geological surveys

 

In practice! the specified stage of the land audit is often neglected by developers! because engineering and geological surveys Conducting engineering require additional costs even before the acquisition of the land plot. Why is it very important to carry out engineering surveys on the land truemoney data plot and perform geological studies (at least partially)? First! the results of such studies! combined with the obtained.

Extract from the urban planning documentation

Will allow to establish information on all existing engineering networks! their protection zones. For example! if an operating high-pressure gas pipeline runs in the middle of the land plot! it will be difficult to implement a construction project! because the protection zones how a crm for companies of such a gas pipeline are 10 meters from the axis of the gas pipeline on both sides! and the developer undertakes to obtain written consent! provided by the GRM Operator! for the right to carry out repair! construction and excavation works near the GRM.

The situation is similar with other engineering networks! which (at best) will need to be “taken out” of the land plot at the developer’s expense and subject to the consent of the owner of such engineering networks! and at worst – will need to be taken into account as a restriction on development.

It is also worth checking the geological conditions

Because sometimes a fairly attractive land plot is located in landslide-prone areas with complex soils or clean email with a high groundwater level! which will significantly affect the cost of construction due to the need to undergo mandatory project expertise in terms of strength! reliability and durability of buildings and structures (including for construction objects with a CC1 impact class)! as well as the need to strengthen the foundations! which entails a significant increase in the cost of construction.